Materials
All the materials used during the project are charged at cost price.
I only use quality products and my quotes are based on using BG Nexus products as standard.
My supplier of choice is TLC Electrical
Labour
My Labour charges include the use of my tools and the replacement of consumable items such as drills and saw blades .
Rates
Hourly – £50 for the first hour, then £35 per hour
Half Day (up to 4 hours) – £150
Full Day (8 hours) – £250
Quotes
I provide quotes based on the above rates, and the cost of materials I expect to use based on my experience.
Where it is not possible to quote, for example, a circuit is tripping – the cost will be based on which ever of the rates works out as the cheapest once it has been found and, if possible, fixed.